Article Content
Article Number | 000039408 |
Applies To | RSA Product Set: RSA Adaptive Authentication (OnPrem) RSA Product/Service Type: Adaptive Authentication (OnPrem) RSA Version/Condition: 7.x |
Issue | Can these Scheduled Tasks be run at the same time?
|
Tasks | From past cases, I knew that the two Volume Growth tasks could be disabled. We have seen in the past where these tasks can cause performance issues. For the Delete Bindings and Delete Unused Desktops, I did not think they should be run at the same time (and had heard that the Delete Bindings should be run before the Delete Unused Desktops so that more desktops could potentially be removed), but wanted to make sure. I followed up with our Engineering Team. |
Resolution | Engineering responded with… "It is not recommended to run any of the scheduled tasks in parallel." |