Shut Down the Entire Cluster
To perform an orderly shutdown of the entire cluster:
1. Log on to the D-SRV, and start Cluster Administrator.
2. For each role in the cluster (LC1, LC2, LC3, and DS1), select the role, right-click,
and select Take Offline.
3. Power off the A-SRV.
4. Power off all CAs.
5. Power off the D-SRV.
Start Up the Entire Cluster
To perform an orderly start up of the entire cluster:
1. Power up the D-SRV.
2. Power up the A-SRV.
3. Power up the CAs.
4. Wait for five minutes.
5. Log on to the D-SRV, and use Cluster Administrator to bring the DS1 role on line,
as follows:
a. Right-click the DS1 group.
b. Select Bring Online.
6. Use the Cluster Administrator to bring the LC Roles online one at a time. Wait for
each role to come online before starting the next role.
As you bring each LC Role online, make sure that the LC Role is assigned to a
unique CA. If each LC Role is not assigned to a unique CA, reassign it as follows:
a. Right-click the LC Role.
b. Select Move Group.
c. Select a CA that is not assigned a role.
Related Articles
Recovering an enVision Database 72Number of Views Wrong system name used when creating mobilink subscription - EA configuration 46Number of Views Lsdata Utility Instructions for RSA enVision 289Number of Views Webserver failed to start - Lockbox fingerprint has changed 167Number of Views To resolve 'Failed to read nst file' issue 66Number of Views
Trending Articles
RSA Authentication Manager 8.7 SP2 Setup and Configuration Guide RSA MFA Agent 2.5 for Microsoft Windows Installation and Administration Guide How to Upgrade Internal SHA-1 Certificates to SHA-256 in Authentication Manager Using rsautil RSA Release Notes for RSA Authentication Manager 8.8 RSA SecurID Desktop Token 5.0.3 for Windows Administrator's Guide