We send out a scheduled report of un reviewed items during a review. However, we have to manually schedule and then un-schedule this report. It would be better if there was an option to stop sending the report when the review is closed:
We send out a scheduled report of un reviewed items during a review. However, we have to manually schedule and then un-schedule this report. It would be better if there was an option to stop sending the report when the review is closed:
To achieve the desired behavior consider using a custom task with Run Report node.